An ongoing road project in Plateau State has been washed away by rain.
According to TrackaNG, an accountability platform, the Yola-Wakat- Bashar road project in Wase Federal constituency of the State was washed away after a heavy downpour.
According to TrackaNG, the road project is being facilitated by Hon. Ahmed Wase, the Deputy Speaker of the House of Representatives and the representative from the constituency the road is located.
From the pictures, it can be seen that the road was poorly constructed using low standard materials.